My Portfolio

Over the years a wide variety of projects have come my way. The pictures and details below provide some details on only a handful of my work.  If you have metal needs, THINK METAL-MADE!

Artistic

  • Candle Holder “Twist”
  • Wall Art
    Wall Art
  • Wedding Cake Topper
    artcaketopper

Tooling for Lawn Care Professionals

  • Aerator (Mower Pull-behind)
    aerator1aerator2aerator3aerator4

Tools for Woodturning/Woodworking

  • Spindle Steady Rest
    spindlesteadyrestspindlesteadyP1030827P1030829
  • Bowl Steady (Prototype)
    bowlsteady1bowlsteady2bowlsteady3
  • Deep Hollowing Rig
    hollowingrig2hollowingrig1my hollow rig 1P1030832
  • Infeed/Outfeed Heavy Duty Roller Stand
    rollerstand

Other Items

  • Staircase (Design in Google Sketchup)
  • Parts Rack
    A CNC Machine shop won a contract to produce 2500 parts per week, continuously. This part consists of 26 individual machined surfaces, each having critical dimensions. The manufacturing process consists of many steps, involving six different locations within the shop. Four machining stations, the QA lab, and the packing-shipping department. Once this process is initialized, the individual parts are to have no contact with external objects, including each other, to insure and maintain integrity. The customer contracted us to design and build a transport that would accommodate six hundred parts, conform to the isolation requirements, insure correct ergonomics in loading and removal of parts, allow smooth mobility, navigate very constricted areas, all while maintaining complete stability.
  • Structure/Frame
    frame1other1
  • Ladder
    ladderladder2
  • Lift
    lift1lift2
  • Other
    other4other2

A CNC Machine shop won a contract to produce 2500 parts per week, continuously. This part consists of 26 individual machined surfaces, each having critical dimensions. The manufacturing process consists of many steps, involving six different locations within the shop. Four machining stations, the QA lab, and the packing-shipping department. Once this process is initialized, the individual parts are to have no contact with external objects, including each other, to insure and maintain integrity.

The customer contracted us to design and build a transport that would accommodate six hundred parts, conform to the isolation requirements, insure correct ergonomics in loading and removal of parts, allow smooth mobility, navigate very constricted areas, all while maintaining complete stability.